Work Projects - Help Needed
Scioto Youth Camp 2010
- Repair the floor joist under the dinning room floor at the back
(market place end) of the dining hall the foundation needs replaced
and some support boards installed. (manual
labor
low
cost)
- The first aid & Daniel's cabin need jacked up and a new
foundation installed. (manual
labor - low cost)
- Noah's Ark cabin needs repaired all around the bottom that sets
on the concrete floor. There needs to be a ditch dug around the
edge of the concrete floor with drainage pipe and gravel installed to
keep water from coming in on the floor. (manual labor - $300 - $500)
- The old chairs and light fixtures need removed from above the
ceiling of the first aid room. The wood strips need to be moved to the
South side of the loft and the good light fixtures and light bulbs
moved to the north side. (manual
labor no cost before bees get active)
- Need to cut down the briars, weeds & some of the small locust
trees on the East end of the Householder Youth Center. (workers that don't get poison Ivy)
- Need to paint any of the pipe posts under the cabins that have
not been recently painted. (manual
labor)
- Need to repair the broken screens on house on the rock. (manual labor)
- Need to repair & or replace the loose wood strips on the
South end of the
chapel. (manual labor - have
materials)
- The obstacle course will need repaired before it can be used
again. (manual labor - cost ?)
- Need to get all the stumps and roots removed and the holes filled
in with dirt. Especially in front of Naomi. (track or back hoe and operator)
- Remodel the side flaps in the chapel to make them safe and easier
to open & close. (skilled Labor - $1000 MAJOR JOB)
- The high fence behind the Householder Youth Center will have to
be
replaced before camp this year. (manual
labor
-
$200 - $400)
- The driveway hill needs straightened up before camp. The ditches
cleaned out, limbs removed, sticks & brush removed on both sides of
the driveway. (manual labor)
- There are many sticks, limbs & wood chips that will need to
be picked up before mowing starts. (manual
labor)
- The volleyball court, play set and tether ball courts will need
to be straightened up and leveled off before camp. (manual Labor)
- The large metal storage pod needs to be power washed and
repainted this year with a lighter color to reflect the hot sun. (manual labor)
- The Householder Youth Center roof needs painted. (manual labor)
- The two old outhouse buildings need to be torn down &
removed before warm weather because of bees. (workers that don't get poison Ivy)